The installation design of central feeding is crucial and affects the operational effectiveness of the entire equipment. If the design is improper, the benefits outweigh the losses, resulting in twice the effort and half the result. So how to reasonably design and install the central feeding system?
Firstly, the exact location and size of the central feed must be calculated. When installing the bracket, please pay attention to the condition of the crane, ceiling, and columns.
The installation design of central supply equipment should be closely linked and installed in an orderly manner to make the system more stable and user-friendly, meeting the needs of advanced modern automated production.
The design scheme for the material warehouse and system control layout of the central supply installation design should meet the requirements and be as close as possible.
The central supply should be installed and designed under reasonable pipeline drainage conditions. Pay attention to reducing bending and making the control device approximately 3m high. When installing the pipeline, please pay attention to the alignment of the injection molding machine, and the pipeline should not leak.